Client: Rowan Drilling 

Asset: Gorilla V MODU

Scope: Upgrade & Maintenance Project

Value: £4M

Pipe Racking System Upgrade to new NOV PRS-8i

Iron Rough Neck Upgrade to new NOV ST-120

Drillers Cabin Upgrade Extension of existing cabin and installation of Amphion cyber chairs

Dead Line Anchor Upgrade to new NOV Raised Dead Line Anchor.

Installation of new NOV Cat Walk Machine

Installation of new Palfinger Knuckle Boom Crane Pipe Handler

EPC - Drilling Package Upgrade

Structural Piping & Mechanical

Dimensional Surveys Offshore Fabrication & Installation

Engineering & Drafting 6GR Coded Stainless -Steel Welding

On-shore Fabrication Supply 4103 High Pressure Welding

Offshore Installation                                   Flushing & Pressure Testing

6GR Carbon Steel Coded Welding Stainless Steel Passivation

Rigging & Lifting

Heat Treatment

Electrical Non Destructive Testing

High Voltage Cable Installation Dye Penetrant Inspection

Fibre optic Cable Installation Magnetic Partial Inspection

Control Cable Installation Eddy Current Inspection

Termination, Test & Commissioning Ultra-Sonic Testing Inspection

EX Inspection