Valaris Gorilla VI

Scope of work

Jacking System ADC Deficiencies Rectifications
STB-AFT Crane Slew Bearing Replacement
NOV Service & Access Basket Installation
MPD Rig Ready Tie-in Points Supply & Installation
BOP Cert Rail Extensions
Rig ADC Deficiencies Rectifications
Jacking Gear Inspections

Valaris Gorilla V

Scope of work

Jacking Column Electrical Containment Replacement
Deadline Anchor 5 Yearly Overhaul
BOP Hose & Festoon Replacement
Leg Liner Replacement
Jacking Gear Repairs
Platform Interface Installation

Valaris 121

Scope of work

MPD Rig Ready Tie-in Points Supply & Installation
Guide Track & Top Drive Alignment
NOV Crown Pad Eye Installation
Well Completion Derrick Beam Supply & Installation
Diesel Oil Purifier Reactivation
Fire Jockey Pump Reactivation
Oily Water Seperator Reactivation
Service Control Air Compressor Reactivation
Water Maker Reactivation

Valaris Gorilla VII

Scope of work

Thruster Removal
Thruster Room Modifications
Jacking Gear Visual Inspection
Diverter & Selector Valve Overhaul
STBD Leg Repairs
Drilling Derrick Tool & Equipment Reactivations
Derrickmans Escape Design, Engineering & Installation
Cantilever Drop Net Design, Engineering & Installation
Derrickmans Escape Installation System
Pre Load Tank Repairs
Koomy Unit Repairs
Spud Can Repairs
Leg Liner Replacement
Jetting Line Cross Over Spools
Raw Water Tower Extension
Load Line Change
Crane Camera Mounts Supply & Installation