Rowan Gorilla VII Jack Up Rig Upgrade
Stowen are pleased to be associated with the successful Rig Upgrade on the Gorilla VII for Rowan.
The Project
Project- Jack Up Rig Upgrade
Duration- 5 Months
Location- Dundee
Man Power- 80 Man Project and Construction Team
The Scope
- Project Planning & Engineering
- Installation of New BOP & Diverter Control System
- Installation of New BOP Tension Jacks & Riser Tensioning System
- Installation of New BOP & Annular Access Platforms
- Installation of New NOV TDX1000 Guide Tracks
- Replacement of Cyber Based Chairs with Amphion Control Chairs in New NOV Drillers Cabin
- Installation of New NOV Drillers Cabin
- Installation of New NOV VFD House
- Installation of New NOV TDX1000 & Traveling Block
- Installation of New TDX1000 Service Systems
- Installation of New TDX1000 Cooling Skid
- Installation of New Zone Management System
- Installation of New Drilling Package CCTV System
- Installation of New Choke & Kill Manifold Control System
- Installation of New Drawworks Control System
- Installation of New Mud Pump Control System
- Installation of New Helideck Netting
- Installation of New Frag Hangers
- Installation of New Air Craft Warning Lights
- Derrick, Guide Track & Rotary Table Alignment
- LER & SCR Modifications
- SCR Sea Water Piping Replacement
- Leg Liner Replacement
- Jetting Line Bolt Replacment
- Jacking Column Repairs
- Drill Floor Winch Repositioning
- Crown Pad Eye Replacement
- 18” Deflector Valve Replacement
- HP Stand Pipe Modifications
- Cantilever Extension Modifications & Installation
- Kato Generator Removal
- Redundant Steam Line Removal