ARO JP Bussell Jack Up Rig Upgrade
Stowen are pleased to be associated with the Jack up Rig Upgrade on JP Bussell for ARO.
The Project
Project – Jack Up Rig Up Grade
Client – ARO
Asset – JP Bussell
Location – Bahrain
Duration – 2 month
Personnel – 20 Man Multi Skilled Project & Construction Team
The Scope
- Derrickman escape system Installation
- Docking Plug Modifications
- Pre Load Tank Repairs
- Flare Boom Connection Points Modifications
- Flare Boom Piping Modifications
- Mud Pump Valve Replacement
- HP Line Modifications
- Helideck Steel Replacement
- API 4G Cat III Inspection & Rectifications
- Derrick Bolt Change Out
- Derrick Member Replacement
- Air Craft Warning Light Replacement
- Deluge Control Cabinet Installation
- New Standpipe Manifold Installation
- Flare Boom Installation
- Trip Tank Modifications
- Derrick, Guide Track, Top Drive & Rotary Alignment
- Recovery Line Anchor Point Installation