ARO JP Bussell Jack Up Rig Upgrade

Stowen are pleased to be associated with the Jack up Rig Upgrade on JP Bussell for ARO.

The Project

Project – Jack Up Rig Up Grade

Client – ARO

Asset – JP Bussell

Location – Bahrain

Duration – 2 month

Personnel – 20 Man Multi Skilled Project & Construction Team

The Scope

  • Derrickman escape system Installation
  • Docking Plug Modifications
  • Pre Load Tank Repairs
  • Flare Boom Connection Points Modifications
  • Flare Boom Piping Modifications
  • Mud Pump Valve Replacement
  • HP Line Modifications
  • Helideck Steel Replacement
  • API 4G Cat III Inspection & Rectifications
  • Derrick Bolt Change Out
  • Derrick Member Replacement
  • Air Craft Warning Light Replacement
  • Deluge Control Cabinet Installation
  • New Standpipe Manifold Installation
  • Flare Boom Installation
  • Trip Tank Modifications
  • Derrick, Guide Track, Top Drive & Rotary Alignment
  • Recovery Line Anchor Point Installation