MAJOR RIG REACTIVATION | ARO DRILLING
MAJOR RIG REACTIVATION | ARO DRILLING
On award of this significant contract, Stowens project team planned and mobilised personnel, equipment, material and consumables to site.
Whilst works were ongoing, our client requested Stowens services on a second drilling asset. Utilising our integrated services and turnkey approach, Stowen ensured the client continuity in completing the diverse work scope packages on the project.
Stowen’s on site Construction Manager worked alongside our client with the demanding schedule and managed the 50 multiskilled Stowen personnel on the project, overseeing and completing all onsite risk assessments, method statements and work packs.
Safety is paramount to Stowen, we ensured our QHSE advisor made regular site visits, cementing our commitment, which resulted in no medical treatment cases or LTI’s on the project.
Work Scope Included:
•Derrick & Drilling tool refurbishment & Upgrade
• Replacement of all HP Mud Lines
• Replacement of LP Flow Lines
• Replacement of Texas Deck
• Electrical Upgrades
• Hull Repairs
•Accommodation Structural & Piping Upgrades
• BOP Control Upgrades
• Shale Shaker Upgrades
• Trip Tank Upgrades
• BOP Set back installation
• Choke & Kill System Upgrade
• Deluge & Fire Suppression System Upgrades
• Access Platform & Stairs fabrication & Installation
To view each scope more in depth, please see the links below.