Valaris DS-04 Drill Ship Reactivation
Stowen are pleased to be associated with the successfully reactivation of the Valaris DS-04 which left its deep water mooring at Astican Shipyard on time & budget.
The Project
Duration- 5 Months
Location- Las Palmas, Gran Canaria
Man Power-19 Man Construction Team
The Scope
- Pipe Racking 5 Yearly Inspection & Maintenance
- Traveling Equipment 5 Yearly Inspection & Maintenance
- Main Wall Sheaves & Active Heave Cylinder Replacement
- Top Drive Overhaul
- AHC Olmstead Valve Replacement
- Diverter Valve Replacement
- Complete Finger Board Latch Overhaul
- New12″ & 6″ Derrick Vent Line Supply & Installation
- Current Meter Platform Installation
- Port & STB Well Test Hang Off Supply & Installation
- 2 x 10t Drill Floor Utility Winch Supply & Installation
- Aux Well Diverter 4 x 15t Pad Eye Supply & Installation
- Cuttings Conveyor Modification & Refurbishment
- Scaffolding Services